检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:胡亚坤[1] 王磊[1] 郭钢[1] HU Ya-kun;WANG Lei;GUO Gang(Offshore Oil Engineering Co.,Ltd.,Tianjin 300452,China)
出 处:《化工管理》2020年第19期160-161,共2页Chemical Engineering Management
摘 要:人类社会的发展需要大量的能源,催生了大量的海洋工程建设。海洋石油工程项目主要包括海洋石油平台、海上FPSO、海洋大型船舶等大型钢结构,项目投资额大、施工周期长,海洋工程服役环境恶劣,因此对质量有更高的要求。文章论述了海洋石油工程类项目质量控制的有效方法,从招投标阶段到设计再到施工检验交付,探讨了每一个流程环节质量控制的有效方法。The development of human society needs a lot of energy,which results in a large number of offshore oil engineering projects.Offshore oil engineering projects mainly include large steel structures such as offshore oil platforms,offshore FPSOs,and offshore large ships.The project has large investment,long construction period,and poor service environment of offshore engineering,so it has higher requirements for quality.This paper discusses the effective methods of quality control in offshore oil engineering projects,from bidding stage to design and construction inspection delivery,and discusses the effective methods of quality control in each process link.
分 类 号:TE54[石油与天然气工程—油气田开发工程] TU712.3[建筑科学—建筑技术科学]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:13.59.48.34