检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:张伟海 刘顺东 ZHANG Wei-hai;LIU Shun-dong(Hot Rolling Department,Shougang Jingtang United Iron and Steel Co.,Ltd.,Tangshan 063210,China)
机构地区:[1]首钢京唐钢铁联合有限责任公司热轧作业部,河北唐山063210
出 处:《冶金自动化》2020年第3期42-44,共3页Metallurgical Industry Automation
摘 要:热轧卷取在快节奏换规格生产的情况下易在输出辊道上发生下一块带钢与上一块带钢追尾的事故,现有控制方法完全依靠操作工控制生产节奏,严重影响热轧生产线的轧制效率。为此,通过增加前后两块带钢运行的时间差作为精轧禁止进入的判断条件,该方法能够有效避免当输出辊道上同时输送两块带钢时发生的追尾撞击问题,且可以释放热轧产能,实现轧制节奏自动控制,降低吨钢成本。In the case of fast-paced production of hot rolling coiling,it is easy for the next strip to rear end with the previous strip on the output roller table. The existing control method relies entirely on the operator to control the production rhythm,which seriously affects the rolling efficiency of the hot rolling production line. Therefore,by increasing the running time difference between the front and back two strips as the judgment condition of no entry in finishing rolling,this method can effectively avoid the rear end collision when two strips are transported on the output roller table at the same time,and can release the hot rolling capacity,realize the automatic control of rolling rhythm,and reduce the cost of per ton steel.
分 类 号:TG335.56[金属学及工艺—金属压力加工]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.43