检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:刘浩 LIU Hao(Taiyuan Coal Industry Design and Research Institute,Taiyuan 030001,China)
机构地区:[1]煤炭工业太原设计研究院,山西太原030001
出 处:《净水技术》2020年第S01期184-188,共5页Water Purification Technology
摘 要:长距离输水工程因距离长易受复杂地形影响,设计难度大.长距离输水工程中定线工作和水锤防护等问题需要重点考虑.文中结合实际工程案例,借助Google地图进行选线工作,利用Bentley Hammer V8i软件建立模型进行水锤计算,并模拟出采取水锤消除措施后的水锤变化.设计思路为类似工程项目和理论计算提供参考.Long-distance water conveyance projects are easy to encounter complex terrain due to its long distance,leading to greater design difficulties.The route alignment and water hammer protection in long-distance water conveyance projects need to be considered.Combined with actual engineering cases,line selection is carried out with the help of Google map,and Bentley Hammer V8i software is used to build a model for water hammer calculation.The water hammer change after adopting water hammer elimination measures is simulated.Besides,design idea provides reference for similar engineering projects and theoretical calculation.
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.13