包钢3~#高炉使用顶装焦生产冶炼实践  

Smelting Practices of Production with Top Charging Coke for 3~# Blast Furnace of Baotou Steel

在线阅读下载全文

作  者:杨帆[1] 郑占斌[2] 王淳 丁坤 田凯[2] Yang Fan;Zheng Zhan-bin;Wang Chun;Ding Kun;Tian Kai(Technical Center of Inner Mongolia Baotou Steel Union Co.,Ltd.,Baotou 014010,Inner Mongolia Autonomous Region,China;Iron-making Plant of Inner Mongolia Baotou Steel Union Co.,Ltd.,Baotou 014010,Inner Mongolia Autonomous Region,China)

机构地区:[1]内蒙古包钢钢联股份有限公司技术中心,内蒙古包头014010 [2]内蒙古包钢钢联股份有限公司炼铁厂,内蒙古包头014010

出  处:《包钢科技》2020年第3期27-30,共4页Science & Technology of Baotou Steel

摘  要:文章以炼铁厂炼铁一部3~#高炉使用顶装焦替换捣固焦为契机,对3~#高炉上下部调剂进行了系统总结,重点分析了入炉燃料改善时,高炉炉况的变化。In this paper,it is systematically summarized the adjustment of upper and lower 3~# blast furnace as well as emphatically analyzed the changes of furnace condition when the fuel in furnace is improved by taking replacing tamping coke with top charging coke for 3~# blast furnace in 1~#Iron-making Workshop of Iron-making Plant as an opportunity.

关 键 词:高炉 焦炭质量改善 调剂措施 

分 类 号:TF543.3[冶金工程—钢铁冶金]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象