船舶艉管后轴承压装计算  

Fitting Calculation of Ship’s After Stern Tube Bearing

在线阅读下载全文

作  者:蔡辉华 杨红军 伍刚 CAI Huihua;YANG Hongjun;WU Gang(YANGFAN GROUP,Ltd,Zhoushan 316100,Zhejiang,China;Shanghai Merchant Ship Design and Research Institute,Shanghai 201203,China)

机构地区:[1]扬帆集团股份有限公司,舟山316100 [2]上海船舶研究设计院,上海201203

出  处:《船舶设计通讯》2020年第1期66-70,共5页Journal of Ship Design

摘  要:以厚壁圆筒理论为基础,分析艉管轴承压装过程中的应力和应变,推导总过盈量和接触压力的计算公式,并对比国内船标和各国外厂家计算公式的差异。以某项目为例,进行对比计算,并给出相关建议。Based on the theory of thick-walled cylinder,the stress and strain of the stern tube bearing during the pressing and assembling procedure were analyzed,and the calculation formulas of the total interference and contact pressure were deduced.The differences between the calculation formulas of the marine standard and the foreign manufacturers were compared.Taking a project as an example,the calculation was carried out and the relevant advice was given.

关 键 词:艉管轴承 过盈压装 厚壁圆筒 

分 类 号:U664.21[交通运输工程—船舶及航道工程]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象