检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:吴军琪 Wu Junqi(Ji'nan Coal Research Institute,Yaukuang Group,Shandong,250000)
出 处:《当代化工研究》2020年第12期38-39,共2页Modern Chemical Research
摘 要:金鸡滩煤矿副斜井因漏水等原因出现变形,处理后变形段井筒无法满足108工作面液压支架整体装车升井的需求,现场需设置井下支架拆解组装硐室.本文详细介绍了硐室设计相关技术方案,最后提出几点建议,对今后相同工况下液压支架拆解组装硐室的设计具有一定的指导意义.The auxiliary inclined shaft of Jinjitan coal mine was deformed due to water leakage and other reasons.After treatment,the shaft in the deformed section could not meet the requirements of the overall loading and lifting of hydraulic supports in the 108th working face.The underground support dismantling and assembling chamber should be set up on site.This paper introduces the technical scheme of chamber design in detail,and finally puts forward some suggestions,which have certain guiding significance for the design of hydraulic support disassembly and assembly chamber under the same working conditions in the future.
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:18.116.27.229