作 者:葛俊波 陈骏生 彭江丰[1] GE Jun-bo;CHEN Jun-sheng;PENG Jiang-feng(Marine Design&Research Institute of China,Shanghai 200011,China)
机构地区:[1]中国船舶及海洋工程设计研究院,上海200011
出 处:《水运工程》2020年第7期75-80,共6页Port & Waterway Engineering
摘 要:针对滚装码头装卸车辆的潮位范围选择问题,以滚装直跳板为研究对象,分析跳板技术状态、船的状态、通行车辆性能和码头参数等因素对作业潮位的影响,并将影响情况定量转化为仅以跳板工作角度为未知数的不等式组,采用数值迭代法求解出跳板工作角度范围,进而预报作业潮位范围,并通过工程实例对该作业潮位预报方法进行验证。结果表明,该作业潮位预报方法具有普遍适用性,可用于指导滚装船制定码头装卸作业计划。Aiming at the problem of choosing the tide level range of loading and unloading operation on ro-ro wharf,we take the straight type ramp as a research object,and analyze the influence on loading and unloading tide level of factors including ramp technical parameters,ship condition,vehicle traveling capacity and wharf parameters,and quantitatively convert the influence to a system of inequalities with ramp working angle as the only unknow,solve the system of inequalities by a numerical iteratively method,forecast the suitable tide level range,and verify the forecasting process by an engineering example.The results show that the method is applicable to the prediction of tide level,and it can be used to guide ro-ro ship to make the loading and unloading plan.
分 类 号:U667[交通运输工程—船舶及航道工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.3