检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:杨俊雨 刘芳琪 刘慧 YANG Junyu;LIU Fangqi;LIU Hui(Inner Mongolia Agricultural University School of Water Conservancy and Civil Construction Engineering ,Hohhot,Inner Mongolia 010020)
机构地区:[1]内蒙古农业大学水利与土木建筑工程学院,内蒙古呼和浩特010020
出 处:《现代农业研究》2020年第7期136-138,共3页Modern Agriculture Research
摘 要:对于农村建设项目,建设方通常都要经过前期策划和可行性研究,经主管部门许可立项后,通过项目设计招标来确定承揽设计任务的设计方;在项目设计的过程中,还需要通过初步设计方案和施工图的审批,再经由施工招标、施工建设、施工验收等一系列的过程,才能够最终实现目标。For a construction project,rural the construction party usually has to go through the preliminary planning and feasibility study.After the approval of the competent department,the designer who undertakes the design task is determined through the project design bidding.In the process of project design,it also needs to go through the approval of the preliminary design scheme and construction drawing,and then through a series of processes such as construction bidding,construction,construction acceptance,etc.To achieve the goal.
分 类 号:S26[农业科学—农业水土工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.171