检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:张新国 ZHANG Xinguo
机构地区:[1]上海公路桥梁(集团)有限公司,上海市201906
出 处:《城市道桥与防洪》2020年第7期247-251,M0023,共6页Urban Roads Bridges & Flood Control
基 金:上海市科委科研计划(17DZ1204101)。
摘 要:结合上海市城市高架独柱墩曲梁安全隐患整治工程,通过足尺试验研究加固方案的适用性,并对加固后的受力模式和传力机理进行探究,为加固方案的精准优化及实施提供有力支撑。试验表明:试验中增设的钢盖梁最大承载力为280 t,满足设计(160 t)要求;当荷载小于150 t时,超高性能混凝土(UHPC)与构件之间不发生黏结破坏,达到设计荷载的0.93倍时栓钉开始参与受力;所进行的试验为加固方案提供了优化方向,也为类似工程的实施提供了参考和依据。Combined with the potential safety hazard treatment projects of urban elevated single-column pier curved beam in Shanghai, the applicability of reinforcement scheme is studied by full scale test. The stress mode and load-transferring mechanism after reinforcement are explored and studied in order to provide the powerful support for accurate optimization and implementation of reinforcement scheme. The test shows that the maximum bearing capacity of the steel bent cap added in this test is 280 t, which meets the design(160 t) requirement. When the load is less than 150 t, no bond failure occurs between the ultrahigh performance concrete(UHPC) and the component. When the design load is 0.93 times, the studs begin to participate in the stress. An optimization direction is provided through this test for the reinforcement scheme, which can be referred for the implementation of the similar projects.
关 键 词:独柱墩 抗倾覆 钢盖梁 超高性能混凝土(UHPC)
分 类 号:U445.4[建筑科学—桥梁与隧道工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.28