检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:毛平尧 MAO Ping-yao(Sinochem(Zhoushan) Xinghai Construction Co., LTD.,Zhoushan Zhejiang 316021,China)
机构地区:[1]中化(舟山)兴海建设有限公司,浙江舟山316021
出 处:《科技和产业》2020年第7期145-149,共5页Science Technology and Industry
摘 要:根据某大型地下水封石油油库可研阶段勘察实施过程,介绍大型地下水封石油油库可研阶段工程勘察的要求和方法、工程物探种类、高密度电法和地震反射法的原理、方法、实施过程中的应用情况、勘察成果整理分析。阐述了物探与钻探、地质测绘相互验证对建库条件的评价。According to the investigation and implementation process of the feasibility stage of a large underground water encolsed oil cavern,this paper introduces the requirements and methods of engineering investigation in the feasibility stage of a large underground water encolsed oil cavern,the types of engineering geophysical exploration,the principles and methods of high-density electrical method and seismic reflection method,the application in the implementation process,and the collation and analysis of investigation results.This paper expounds the mutual verification of geophysical exploration,drilling and geological surveying to the evaluation of reservoir construction conditions.
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.38