两河口水电站下游低线混凝土生产系统扩建设计  被引量:1

Extension Design of Low-line Concrete Production System Downstream of Lianghekou Hydropower Station

在线阅读下载全文

作  者:王红军 黄兴周 WANG Hong-jun;HUANG Xing-zhou(POWERCHINA SINOHYDRO BUREAU 14 CO.,LTD.,Kunming 650000,China)

机构地区:[1]中国水利水电第十四工程局有限公司,云南昆明650000

出  处:《云南水力发电》2020年第4期125-127,131,共4页Yunnan Water Power

摘  要:混凝土生产系统作为电站混凝土浇筑供给的辅助性工程,系统设计布置的成败直接影响系统建设期施工效率和运行维护成本。介绍两河口水电站下游低线混凝土生产系统扩建(二期)在有限的占地面积内,合理利用一期建筑物资源,在不影响一期系统各项功能使用的前提下对系统产能进行扩容一倍,将因地制宜、合理布局运用到极致。As an auxiliary project for concrete placing supply of power plant, the success of system design and layout directly affects the construction efficiency and operation and maintenance cost of the system during construction period. This paper mainly describes the expansion(Phase Ⅱ) of low-line concrete production system downstream of Lianghekou Hydropower Station in a limited area, the reasonable use of building resources in Phase Ⅰ, without affecting the use of various functions of Phase I system, the capacity of the system is doubled, and the local conditions and reasonable layout are applied to the extreme, which can be used for reference by similar projects.

关 键 词:混凝土生产系统 扩建设计 两河口水电站 合理布局 

分 类 号:TV431[水利工程—水工结构工程]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象