升富矿主斜井垂直冻结关键技术研究  

Research on Key Technology of Vertical Freezing of Main Inclined Shaft in Shengfu Mine

在线阅读下载全文

作  者:魏璐晖 WEI Luhui

机构地区:[1]煤炭工业西安工程造价管理站,陕西西安710000

出  处:《山西科技》2020年第4期131-133,共3页Shanxi Science and Technology

摘  要:为解决升富矿主斜井垂直冻结凿井问题,通过理论计算、类似工况论证及实测方法,进行了参数及方案设计。结果表明:主斜井明、暗挖段在凿井中冻结温度、冻结壁厚度均达到设计要求,冻结提前12天完成,且冻结过程无渗漏水,井筒收敛变形符合规范要求,冻结参数及方案合理可行。In order to solve the problem of vertical freezing sinking in the main inclined shaft of Shengfu Mine,the parameters and scheme are designed through theoretical calculation,demonstration of similar working conditions and actual measurement methods.The results show that the freezing temperature and the thickness of the frozen wall in the open and hidden sections of the main inclined shaft meet the design requirements,the freezing is completed 12 days in advance,and there is no leakage during the freezing process,the convergent deformation of the inclined shaft meets the standard requirements,and the freezing parameters and scheme are reasonable and feasible.

关 键 词:主斜井 冻结凿井 方案设计 

分 类 号:TD265.3[矿业工程—矿井建设]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象