临时供电措施在电力系统改造工程中的应用  被引量:2

Application of Temporary Power Supply Measures in Power System Transformation Project

在线阅读下载全文

作  者:韩帅 迟秀华 王林松[1] 李达[1] HAN Shuai;CHI Xiuhua;WANG Linsong;LI Da(The Energy Management and Control Center of Ansteel,Anshan,Liaoning 114003,China)

机构地区:[1]鞍钢股份有限公司能源管控中心,辽宁鞍山114003

出  处:《冶金动力》2020年第7期9-13,共5页Metallurgical Power

摘  要:钢铁企业属于重要电力负荷,大多属于一类或二类电力负荷,通常由2路及以上电源供电。以3例临时供电措施在工程实例中的应用,来解决无法长期停产检修配合的重要产线的2路电源同停检修的问题。给电力系统中较困难停电的工程提供借鉴。Steel enterprises are important power loads, most of which belong to class I or class II power loads, usually powered by two or more power sources. The application of temporary power supply measures in three engineering cases to solve the problem of twoway power supply shutdown maintenance of important production lines that cannot be coordinated with long-term shutdown maintenance is introduced, to provide some reference for power system projects with difficulty of power cutoff.

关 键 词:临时供电措施 电力系统 电力负荷 

分 类 号:TM715[电气工程—电力系统及自动化]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象