检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
机构地区:[1]宁夏回族自治区固海扬水管理处,中卫755100
出 处:《中国水利》2020年第14期46-49,共4页China Water Resources
摘 要:为加快推进宁夏中部干旱带脱贫攻坚、解决水资源短缺问题,宁夏回族自治区水利厅提出了固海扬水工程渠首泉眼山泵站“6+1”运行调整工程,将首级泵站由原设计5台运行、2台备用“5+2”运行方式调整为6台运行1台备用“6+1”运行方式,增加流量3.8 m3/s,配套对后续泵站及渠道进行增流改造。固海“6+1”运行调整工程开展了水泵增流叶轮研制和试验运行、泵站运行及优化调度、渡槽降低糙率等研究。研究成果为本工程改造提供了技术支撑和低成本解决方案,在固海扬水工程增流改造工程实践中得到了应用,取得了明显成效。In order to reduce poverty and alleviate water shortage in central arid zone,the water resources department of Ningxia Hui Autonomous Region proposed to change the operation mode of Quanyanshan Pumping Station at the head of Guhai Water Lifting Scheme,from the original design of 5 sets of operation and 2 sets of standby to 6 sets of operation and 1 set of standby.This can help to increase the flow by 3.8 m3/s by subsequent rehabilitation of pumping stations and canals.Research and test operation had been applied booster impeller of pump,optimal operation of pump station,and reduction of the roughness of the aqueduct.The results provide technical and low-cost solutions for upgrading of the pumping stations,and obtained obvious achievements with its application in practice.
关 键 词:高扬程灌溉泵站 交替加载技术 水工建筑物 渡槽 改造
分 类 号:TV675[水利工程—水利水电工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.229