检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:张帆 刘亚志 王鹏 王明磊 Zhang Fan;Liu Yazhi;Wang Peng;Wang Minglei(Hengshan Weiqiang Coal Industry Co.,Ltd.,Shaanxi Yanchang Petroleum Group,Yulin 719100,China;Langfang Jinglong Heavy Equipment Co.,Ltd.,Langfang 065300,China)
机构地区:[1]陕西延长石油集团横山魏墙煤业有限公司,陕西榆林719100 [2]:2.廊坊景隆重工机械有限公司,河北廊坊065300
出 处:《煤矿机械》2020年第7期132-133,共2页Coal Mine Machinery
摘 要:随着我国综合机械化采煤技术的快速发展,与之相配套的巷道掘进技术从21世纪以来基本处于停滞状态,采掘失调问题一直制约着我国现代化矿井的快速发展。为提高综采巷道掘进速度,魏墙煤矿在原有四臂顶锚杆钻车的基础上,在国内首次配备了六臂帮锚杆、顶锚索钻车,形成一种四、六臂锚杆钻车联合全机械化作业的新工艺,并取得了很好的应用效果。Along with rapid development of fully mechanized coal mining technology,the matched roadway tunneling technique has being stagnant since the 21 st century and the rapid development of modern mine has being restricted by mining and tunneling maladjustment.In order to improve the tunneling speed of fully mechanized roadway,a 6-arm roof/rib bolter was equipped at Weiqiang coal mine,working with existing 4-arm roof bolter for the first time in China,formed a new tunneling process of 4 and 6 arm bolters combined mechanized operation,and received very good results.
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.15