检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:张志兵[1] Zhang Zhibing(Wuyang Mine,Shanxi Lu’an Environmental Energy Development Corporation Ltd.,Changzhi 046200,China)
机构地区:[1]山西潞安环保能源开发股份有限公司五阳煤矿,山西长治046200
出 处:《煤炭与化工》2020年第6期9-12,共4页Coal and Chemical Industry
摘 要:为解决深井高应力巷道围岩变形严重、支护困难的技术难题,本文采用数值模拟、工业性试验等方法对五阳煤矿7608工作面运输巷围岩变形规律以及支护参数进行了分析与研究。结果表明,随着采动影响的加剧,巷道围岩非连续变形及非对称变形均也逐步加剧,在采用新支护方案后,巷道顶底板及两帮变形量最终稳定在240 mm、320 mm,说明采用锚网索联合支护方案能够有效控制巷道围岩变形破坏。In order to solve the technical problems of deep shaft high-stress roadway deformation and serious support difficulties, the numerical simulation and industrial tests were used to analyze the deformation law and support parameters of the surrounding roadway in 7608 working face of Wuyang Mine. The results showed that with the intensification of mining, the discontinuous deformation and asymmetric deformation of the surrounding rock of the roadway were also gradually intensified. After adopting the new support scheme, the deformation of roadway roof, floor and two sides finally stabilized at 240 mm and 320 mm, it showed that the combined support scheme of anchor, net and cable can effectively control the deformation and failure of roadway surrounding rock.
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.66