检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:熊馨[1] 陈攀[1] 孙晓华[1] 应永朋 赵玉卿[1] Xiong Xin;Chen Pan;Sun Xiaohua;Ying Yongpeng;Zhao Yuqing(Qinghai Province Geology Ore Testing and Application Center)
出 处:《黄金》2020年第7期57-61,共5页Gold
基 金:青海省重点研发与转化计划项目(2019-SF-139);青海省财政科技专项资金(NK2019003);青海学者资助项目(青人社厅函〔2019〕48号)。
摘 要:青海某含金铁矿石金品位2.87 g/t、全铁品位30.67%,金嵌布状态复杂,回收难度较大,且磁铁矿与黄铁矿、磁黄铁矿等嵌布关系紧密,解离难度大,影响铁精矿质量。针对矿石性质,采用原矿浮选金—弱磁选铁—铁精矿反浮选脱硫—磁选尾矿环保型浸金剂浸出工艺流程,金总回收率可达84.46%,伴生组分银回收率为89.26%,铁精矿全铁品位64.15%、全铁回收率67.63%,实现了矿石中金、铁及伴生组分银的综合回收。A gold-bearing iron ore from Qinghai contains 2.87 g/t gold and 30.67%total iron.The embedding status of gold is complicated,making it difficult to recycle gold.The magnetite was closely associated with pyrite and pyrrhotite,making it difficult to disintegrate them,thus the quality of iron concentrates is affected.Therefore,based on the ore property,the flowsheet of gold flotation from raw ores-iron recovery with weak magnetism-desulfurization by reverse flotation of iron concentrates-leaching of magnetic separation tailings with environment-friendly gold leaching agent is adopted and the total gold recovery rate obtained can be 84.46%,the recovery rate of the associated silver is 89.26%,the total iron grade in the iron concentrates is 64.15%,total iron recovery rate is 67.63%,and the comprehensive recovery of gold,iron and associated silver in ores is realized.
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.249