检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:刘捷 龙正如 苏长南 LIU Jie;LONG Zhengru;SU Changnan(Guangdong YudeanYangjiang Offshore Wind Power Co.,Ltd, Yangjiang 529500, China)
机构地区:[1]广东粤电阳江海上风电有限公司,广东阳江529500
出 处:《广东水利水电》2020年第7期83-86,共4页Guangdong Water Resources and Hydropower
摘 要:由于部分液压冲击锤不具备水下沉桩能力,海上风电先桩法导管架沉桩施工需要借助送桩器进行送桩。在工程桩桩顶插接送桩器,打桩锤通过锤击送桩器,将能量传递至工程桩,从而将桩打入。通过高应变动力检测手段检测锤击时送桩器及工程桩能量和应力,可以测算送桩器能量消散比例,为海上风电行业沉桩施工及打入性分析提供参考。Because of some hydraulic impact hammers that do not have the ability to pile underwater,offshore wind power pre-piled jacket often cannot directly drive the pile with a pile hammer,and a pile extension must be used.The piling hammer transmits the energy to the pile by hammering the pile extension,thereby driving the pile to a predetermined depth.The energy dissipation ratio can be measured,by the high-strain dynamic testing during hammering the pile extension,this provideS a reference for the piling analysis in offshore wind power industry.
分 类 号:U655.551[交通运输工程—港口、海岸及近海工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.49