海上导管架沉桩施工送桩器能量消散分析  被引量:5

Energy Dissipation Analysis of Pile Extension in Piling of Offshore Wind Turbine Jacket Foundation

在线阅读下载全文

作  者:刘捷 龙正如 苏长南 LIU Jie;LONG Zhengru;SU Changnan(Guangdong YudeanYangjiang Offshore Wind Power Co.,Ltd, Yangjiang 529500, China)

机构地区:[1]广东粤电阳江海上风电有限公司,广东阳江529500

出  处:《广东水利水电》2020年第7期83-86,共4页Guangdong Water Resources and Hydropower

摘  要:由于部分液压冲击锤不具备水下沉桩能力,海上风电先桩法导管架沉桩施工需要借助送桩器进行送桩。在工程桩桩顶插接送桩器,打桩锤通过锤击送桩器,将能量传递至工程桩,从而将桩打入。通过高应变动力检测手段检测锤击时送桩器及工程桩能量和应力,可以测算送桩器能量消散比例,为海上风电行业沉桩施工及打入性分析提供参考。Because of some hydraulic impact hammers that do not have the ability to pile underwater,offshore wind power pre-piled jacket often cannot directly drive the pile with a pile hammer,and a pile extension must be used.The piling hammer transmits the energy to the pile by hammering the pile extension,thereby driving the pile to a predetermined depth.The energy dissipation ratio can be measured,by the high-strain dynamic testing during hammering the pile extension,this provideS a reference for the piling analysis in offshore wind power industry.

关 键 词:沉桩 送桩器 高应变动力检测 

分 类 号:U655.551[交通运输工程—港口、海岸及近海工程]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象