沪苏湖高速铁路引入上海枢纽既有线施工组织方案研究  

Research on Construction Organization Scheme of Shanghai Junction Existing Line Introduced into Shanghai-Suzhou-Huzhou High-Speed Railway

在线阅读下载全文

作  者:王浩 WANG Hao(Shanghai Railway Hub Project Construction Headquarters of China Railway Shanghai Bureau Group Corporation,Shanghai 200071,China)

机构地区:[1]中国铁路上海局集团公司上海铁路枢纽工程建设指挥部,上海200071

出  处:《中小企业管理与科技》2020年第16期184-186,共3页Management & Technology of SME

摘  要:大型铁路建设工程规模大,施工组织方案是工程顺利完成的关键。论文结合沪苏湖高速铁路引入上海枢纽改造工程,对施工组织方案进行了探讨,分析了工程的关键问题,提出了方案的优化措施,通过合理确定组织方案、合理安排各项工程的施工顺序,减少施工对既有线的影响。The scale of large railway construction projects is large,the construction organization plan is the key to the successful completion of the project.Combined with the transformation project of Shanghai-Suzhou-Huzhou high-speed railway into Shanghai hub,this paper discusses the construction organization scheme,analyzes the key problems of the project,and puts forward the optimization measures of the scheme.The influence of construction on existing railway line can be reduced by reasonably determining organization scheme and arranging construction sequence of every project.

关 键 词:既有站 改造 施工组织 

分 类 号:U292[交通运输工程—交通运输规划与管理]

 