检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:李仕龙 王林 LI Shilong;WANG Lin(Friendship International Engineering Consulting Co.,Ltd.,Changsha 410000,China;Architectural Design Institute of China Construction Fifth Bureau,Changsha 410000,China)
机构地区:[1]友谊国际工程咨询有限公司,湖南长沙410000 [2]中国建筑五局建筑设计院,湖南长沙410000
出 处:《现代建筑电气》2020年第6期18-21,共4页Modern Architecture Electric
摘 要:分析了自动转换开关(ATSE)动作时间与接触器释放时间,确定ATSE自复动作完成后电机主回路的状态。研究了电机断电重合闸瞬态时,定子电动势、定子电流等参数与额定状态下关系,表明缩短ATSE自复动作时间并不可行,并阐述了消防型ATSE自复功能的使用建议及措施。The action time of automatic transfer switch equipment(ATSE)and release time of contactor were analyzed.The state of motor main circuit was determined after ATSE self-recovery.At the same time,the relationship between the parameters of stator electromotive force,stator current and rated state was studied when the motor was in the transient state of power-off reclosing.It shows that it is not feasible to reduce the action time of ATSE self-recovery.The suggestions and measures for the use of fire fighting ATSE self-recovery function were given.
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.238