检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:张庆灵 秦许昌 ZHANG Qingling;QIN Xuchang(Luoyang Zhichao Electromechanical Technology Co.,Ltd.,Luoyang 471031,Henan,China)
机构地区:[1]洛阳智超机电科技有限公司,河南洛阳471031
出 处:《矿山机械》2020年第7期30-35,共6页Mining & Processing Equipment
摘 要:目前,矿井主立井提升系统中提升机、装载站、卸载站已具备自动、手动、检修3种运行方式,改造的目的是要实现无人值守的、三者集中统一的远程集中监控。本着"自动化减人、机械化换人"的理念,分别对提升机、装卸载集控站、装载站、卸载站和远程集控站的电控系统进行自动化改造,实现了无人值守、减员增效的目的,并可通过互联网,实现异地的系统监测、监控和数据分析。At present,the hoist,loading station and unloading station of the hoisting system in main shaft have three operation modes such as automatic,manual and maintenance,the transformation goal was to realize the unmanned watching and remote centralized monitor integrating the above three modes.Based on the concept of ’staff reduction on automation and staff switch on mechanization’,the electric control system of the hoist,the electric control system of loading and unloading centralized control station,the electric control system of loading station,the electric control system of unloading station and the remote centralized control station were transformed,thus the unmanned watching,staff reduction and efficiency improvement realized.Moreover,remote inspection,monitor and data analysis realized via internet.
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:18.118.187.83