检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:史峤 Shi Qiao(Dadougou Coal Industry Co.,Ltd.of Datong Coal Mine Group,Datong Shanxi 037026)
机构地区:[1]大同煤矿集团大斗沟煤业有限公司机掘二队,山西大同037026
出 处:《机械管理开发》2020年第6期129-130,156,共3页Mechanical Management and Development
摘 要:为了解决煤巷掘支矛盾,实现安全高效掘进,以JM340型掘锚机组为核心,配套其他设备,组建了高效快速掘进系统。对该系统的设备选型进行了分析确定,系统于2017年7月在大斗沟煤矿投入使用,应用效果良好,实现了平均月进尺2 400 m,极大地提高了煤巷单进水平。In order to solve the contradiction of coal roadway excavation and realize safe and efficient excavation,an efficient and rapid excavation system is set up with JM340 type anchor unit as the core supporting equipment.The equipment selection of the system is analyzed and determined.The system was put into use,and the application effect is good,and the average monthly advance is achieved 22400 m,greatly improved the single entry level of coal lanes.
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.171