摘  要:沁裕煤矿的副斜井车场已经掘进完成,需要对车场连接处的交岔点进行施工。为了保证掘进的速度和效率,采用了钻爆法施工。详细地介绍了交岔点的施工方案和支护方式,并简单介绍了采取的安全措施,可以为类似条件下井底车场交岔点的施工提供参考。The auxiliary inclined shaft yard of Qinyu Coal Mine has been excavated,so it is necessary to construct the intersec-tion at the junction of the yard.In order to ensure the speed and efficiency of driving,the drilling and blasting method was adopted.This paper introduced the construction scheme and support method of the crossing point in detail,and briefly introduced the safety measures taken,which can provide a reference for the construction of the crossing point in the shaft yard under similar conditions.

关 键 词:副斜井 井底车场 交岔点 施工方案 支护方式 

分 类 号:TD262.12[矿业工程—矿井建设]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象