TST技术在阿拉套山隧道超前地质预报中的综合应用  

Comprehensive Application of TST Technology in Advance Geological Forecast of Alatao Mountain Tunnel

在线阅读下载全文

作  者:邓亚峰 DENG Yafeng(Henan Huazheng Engineering Test Co.,Ltd.,Zhengzhou Henan 450000)

机构地区:[1]河南华正工程试验检测有限责任公司,河南郑州450000

出  处:《河南科技》2020年第20期114-115,共2页Henan Science and Technology

摘  要:在隧道施工过程中,隧道前方岩溶发育情况不清楚,地质构造复杂,岩体破碎情况不明确。为了确保施工安全,减少和避免地质灾害发生,人们可以采用TST技术对隧道进行超前预报。结果表明,TST技术有效地提高了分析精度和构造定位精度,消除了侧向回波和面波,成功地解决了断层、破碎带及含水带的超前地质预报问题,因此该技术可以广泛应用于隧道施工地质灾害的预报中。During the construction of the tunnel,the development of the karst in front of the tunnel is unclear,the geological structure is complex,and the rock fragmentation is unclear.In order to ensure construction safety,reduce and avoid the occurrence of geological hazards,people can use TST technology to forecast the tunnel in advance.The results show that TST technology effectively improves the analysis accuracy and tectonic positioning accuracy,eliminates lateral echoes and surface waves,and successfully solves the problem of advanced geological prediction of faults,fractured zones and water-bearing zones.Therefore,this technology can be widely used in the prediction of tunnel construction geological hazards.

关 键 词:TST技术 超前地质预报 阿拉套山隧道 

分 类 号:U452.11[建筑科学—桥梁与隧道工程]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象