检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:彭满华 陈志新 张海顺 Peng Manhua;Chen Zhixin;Zhang Haishun(China Shipbuilding Industry Institute of Engineering Investigation and Design Co.,Ltd.,Shanghai 200063,China)
机构地区:[1]中船勘察设计研究院有限公司,上海200063
出 处:《岩土工程技术》2020年第4期225-228,233,共5页Geotechnical Engineering Technique
摘 要:某工程先后进行了两次试桩,但试桩承载力均不满足设计要求。从地质原因和施工原因对此进行分析,在排除地质原因的基础上,从施工工艺及注浆工艺方面提出相应的解决措施。第三次试桩施工在采取相关措施后,其承载力终能满足设计要求。相关措施对后续大面积工程桩的施工具有重要的指导意义,同时对在类似厚层砂(粉)性土层中进行桩端后注浆钻孔灌注桩的施工具有重要的借鉴意义。Two pile bearing capacity tests have been carried out in a project,but the bearing capacity of test piles does not meet the design requirements.The geological factors and construction factors are analyzed,and the corresponding treatment measures are provided considering the aspects of construction technology and grouting technology on the basis of eliminating geological factors.Relevant measures are taken,and the bearing capacity of the third pile test construction can finally meet the design requirements.These measures have important guiding significance for the construction of large-area engineering piles,and also have important reference significance for the construction of post-grouting bored piles in similar thick sandy soil and silty soil.
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.222