丰满重建工程施工期度汛方式优化调整研究  

Study on optimization and adjustment of flood control mode during construction period of Fengman reconstruction project

在线阅读下载全文

作  者:王富强[1] 王福运[1] 蒋宾 王业庭 WANG Fu-qiang;WANG Fu-yun;JIANG Bin;WANG Ye-ting

机构地区:[1]中水东北勘测设计研究有限责任公司,吉林长春130021 [2]国网新源控股有限公司,北京100761

出  处:《东北水利水电》2020年第8期63-66,72,共5页Water Resources & Hydropower of Northeast China

摘  要:文中论述了丰满重建工程施工期度汛方式优化调整原则、度汛方式拟定、方案比选等内容。通过工程实际应用,优化调整后的度汛方式发挥了水库的调蓄作用,既保证度汛安全,又有利于工程施工,同时不影响下游供水等综合功能。This paper discusses the principle of optimization and adjustment of flood control methods during the construction period of Fengman reconstruction project, the formulation of flood control methods and the comparison and selection of plans. Through the practical application of the project, the optimized and adjusted flood control mode plays a role in the regulation and storage of the reservoir, which not only ensures the safety of flood control, but also facilitates the construction of the project without affecting the downstream water supply and other comprehensive functions.

关 键 词:丰满重建工程 施工期度汛 度汛标准 优化 

分 类 号:TV697.11[水利工程—水利水电工程]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象