检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:胡井海 马樱 蔡微微 Hu Jinghai;Ma Ying;Cai Weiwei(CASCO Signal Ltd.Beijing 100070,China)
出 处:《铁路通信信号工程技术》2020年第8期94-96,共3页Railway Signalling & Communication Engineering
摘 要:高铁线路所通常设置在铁路区间正线与联络线、疏解线或其他特定线路的交汇处或分离处,部分线路所采用单独设置列控中心、计算机联锁系统的方式。针对线路所侧线通过进路与邻站进站信号机之间采用红灯重复原则的情况进行分析,介绍计算机联锁与列控中心系统对此场景的特殊设计方法。The block post of high-speed railway is usually set at the intersection or separation between main line of the railway section and the connecting line,untwining line or other specific lines.Some block posts adopt the method of separate setting of train control center(TCC) and computer interlocking system.This paper analyzes the situation in which the principle of red light repetition used between siding through route of block post and adjacent entrance signal.This paper also introduces special design method of computer interlocking and TCC system for above scene.
分 类 号:U284.1[交通运输工程—交通信息工程及控制]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.62