检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:孙学阳[1,2,3] 张齐 李成 张磊 SUN Xueyang;ZHANG Qi;LI Cheng;ZHANG Lei(College of Geology and Environment,Xi’an University of Science and Technology,Xi’an 710054,China;Shaanxi Provincial Key Laboratory of Geological Support for Coal Green Exploitation,Xi’an 710054,China;Geological Research Institute for Coal Green Mining,Xi’an University of Science and Technology,Xi’an 710054,China;Key Laboratory of Mine Geological Hazards Mechanism and Control,Xi’an 710054,China)
机构地区:[1]西安科技大学地质与环境学院,陕西西安710054 [2]陕西省煤炭绿色开发地质保障重点实验室,陕西西安710054 [3]西安科技大学煤炭绿色开采地质研究院,陕西西安710054 [4]矿山地质灾害成灾机理与防控重点实验室,陕西西安710054
出 处:《煤田地质与勘探》2020年第4期183-189,共7页Coal Geology & Exploration
基 金:国家自然科学基金项目(41272388,40572155)。
摘 要:多煤层开采条件下煤层覆岩破坏具有独特的特征,影响矿井生产布置。以陕北某矿为例,以该矿地质采矿条件为基础,采用相似材料模拟实验与数值模拟相结合的方法,通过建立模拟模型,开展了双煤层开采对覆岩的破坏影响研究。结果显示:留设不同宽度的煤柱,采用相似材料模拟和数值模拟2种方法得到的煤层覆岩垮落带高度、裂隙带高度都基本一致;在双煤层开采时,留设的煤柱宽度越大,两个煤层的叠置区域就越小,煤层开采对覆岩的破坏程度就越小。在工作面布置时,建议增大两个煤层的开采距离,并尽量增加煤柱宽度,以减缓覆岩移动破坏范围和破坏程度。研究成果为类似双煤层开采工作面的设计及覆岩破坏控制提供技术支撑。Under the conditions of multi-seam mining,the overburden failure of coal seams has unique characteristics,which affects the mine production arrangement.Taking a mine in northern Shaanxi Province as an example,based on the geological and mining conditions of the mine,the influence of double-seam mining on overburden rock damage was analyzed by using the method of similar material simulation experiment and numerical simulation.The results show that the height of the caving zone and the height of the fractured zone in the overburden of coal seam obtained by using similar material simulation and numerical simulation with different widths of coal pillars were basically the same.In the double-seam mining,the larger the width of the coal pillar is,the smaller the superposition area of the two coal seams is,and the smaller the degree of damage to overburden is.In the arrangement of working face,it is suggested to increase the mining distance between two coal seams and increase the width of coal pillar as far as possible,so as to slow down the damage scope and the extent of overburden movement.
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.101