检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:冷海洋 秦国栋 LENG Haiyang;QIN Guodong(China Urban Construction Design&Research Institute Co.,Ltd.,100120,Beijing,China)
机构地区:[1]中国城市建设研究院有限公司,北京100120
出 处:《城市轨道交通研究》2020年第8期1-5,10,共6页Urban Mass Transit
摘 要:以南通市为例,探讨了Ⅰ型大城市城市轨道交通线网规划中面临的主要问题。从功能定位、服务范围、规模、布局思路等论述了Ⅰ型大城市的城市轨道交通线网规划思路及目标,估算了南通轨道交通线网规模,并制定了南通轨道交通线网规划方案。Ⅰ型大城市的城市轨道交通线网规划应结合交通需求与城市经济能力,合理把握建设时机和时序。Taking Nantong City as a case,the main problems in urban rail transit network planning of the Type Ⅰ big city in China are discussed.The planning ideas and objectives for the network planning in Type Ⅰ big cities are elaborated from the perspectives of functional orientation,service scope and scale,network layout idea and so on.On this basis,the scale of Nantong rail transit network planning is calculated,appropriate planning for Nantong is developed.It is pointed out that the urban rail transit network planning in Type Ⅰ big cities should grasp the construction opportunities and time sequence reasonably according to the traffic demands and urban economic capacity.
分 类 号:U231.1[交通运输工程—道路与铁道工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.28