检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:邱会安 QIU Hui'an(Shanghai Tianyan Evolution Building Shift Engineering Co.,Ltd.,Shanghai 200336,China)
机构地区:[1]上海天演建筑物移位工程股份有限公司,上海200336
出 处:《建筑施工》2020年第7期1219-1222,共4页Building Construction
摘 要:围绕一栋总建筑面积为22 728.27 m^2、总质量约30 000 t的建筑,面对地块新的规划冲突,从各个方面综合考虑、深入分析,决定采取将主站房绕虚拟旋转中心旋转平移90°的方式为新规划铁路让路。综合以往平移工程经验,根据实际工程需要,开发了一种新型的"交替式步履走行器"平移工艺,为建筑物平移提供了一个全新的方向,也为其他项目积累了成功经验。Around a building with a total building area of 22 728.27 m^2 and a total mass of about 30 000 tons, in the face of the new planning conflict of the plot, from all aspects of comprehensive consideration and in-depth analysis, it is decided to take the way of 90 ° rotation and translation of the main station around the virtual rotation center to make way for the newly planned railway. Based on the previous experience of translation engineering, a new type of "alternating walking device" translation technology is developed according to the actual engineering needs, which provides a new direction for building translation and accumulates successful experience for other projects.
关 键 词:单体面积最大 单体质量最大 旋转平移 交替式步履走行器
分 类 号:TU7[建筑科学—建筑技术科学]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:3.133.158.178