高校实验室废水处理站的运行与调试  被引量:5

Daily operation and management of wastewater treatment station in university laboratories

在线阅读下载全文

作  者:沈家辰 黄梦霞 谢国建 蔡鲁祥 毛芝娟[1] 沙昊雷[1] SHEN Jiachen;HUANG Mengxia;XIE Guojian;CAI Luxiang;MAO Zhijuan;SHA Haolei(College of Biological&Environmental Sciences,Zhejiang Wanli University,Ningbo 315100,China;Nanyang Street Agency of Xiaoshan District People’s Government in Hangzhou,Hangzhou 311227,China;College of Arts and Design,Ningbo University of Finance&Economics,Ningbo 315175,China)

机构地区:[1]浙江万里学院生物与环境学院,宁波315100 [2]杭州市萧山区人民政府南阳街道办事处,杭州311227 [3]宁波财经学院艺术设计学院,宁波315175

出  处:《环境工程学报》2020年第7期1950-1957,共8页Chinese Journal of Environmental Engineering

基  金:宁波市公益类科技计划项目(2019C50002);浙江省科技计划项目(2017C37071)。

摘  要:针对宁波某高校实验室废水处理站运行情况,研究了该废水处理站pH、NH3-N、COD以及重金属的处理效果,并对生物膜镜检和胞外聚合物(EPS)提取分析。实验结果表明:出水COD小于40 mg·L-1,NH3-N去除率维持在70%~90%,且出水pH、NH3-N、COD均满足《污水综合排放标准》(GB 8978-1996)一级排放标准,重金属满足《污水综合排放标准》(GB 8978-1996)三级排放标准;但运行期间废水处理站出现了COD和重金属去除效率低的情况,最终确定原因为废水处理站低负荷运行以及中和调节池和接触氧化池曝气过度。因此,建议减少中和调节和接触氧化池的曝气量,并适当投加碳源以保持废水站稳定运行。Aiming at the operation of the laboratory wastewater treatment station in a university in Ningbo, the treatment effects of pH, NH3-N, COD and heavy metals in this station were studied, the biofilm was observed with microscopy and the extracellular polymer(EPS) were extracted and analyzed. The experimental results showed that the effluent COD was lower than 40 mg·L-1, the NH3-N removal rate was maintained at 70%~90%,and the effluent pH, NH3-N and COD met the first-level discharge standard of Integrated Wastewater Discharge Standard(GB 8978-1996), and the effluent heavy metals met the third-level discharge standard of Integrated Wastewater Discharge Standard(GB 8978-1996), but low removal rates of COD and heavy metals in wastewater treatment station occurred sometimes during operation. The final determined reason was the lowloading operation of the wastewater treatment station and the excessive aeration of the neutralization regulation tank and the contact oxidation tank. Therefore, it is suggested to reduce the aeration of neutralization regulation and contact oxidation tank, and add carbon source properly to maintain the stable operation of wastewater station.

关 键 词:实验室废水 废水处理站 生物膜 运行调试 

分 类 号:X703.1[环境科学与工程—环境工程]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象