检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:包中进[1] 刘云[1] 韩晓维[1] BAO Zhong-jin;LIU Yun;HAN Xiao-wei(Zhejiang Institute of Hydraulics and Estuary,Hangzhou 310020,China)
出 处:《中国农村水利水电》2020年第8期62-65,70,共5页China Rural Water and Hydropower
基 金:浙江省水利科技计划项目(RC1736)。
摘 要:杭州八堡排水泵站为扩大杭嘉湖南排重大水利工程,也是京杭运河沟通钱塘江第二通道的关键性节点工程,设计排涝流量200 m^3/s,为大(1)型排涝泵站。由于泵站进水口与八堡船闸引航道交汇布置,泵站运行对进水口附近通航水流条件及航道冲刷产生影响。通过建立泵站及泵前航道平面二维数学模型,计算分析了泵站不同运行工况下进水口附近流速流态分布情况,提出了满足泵前航道安全的调度运行方式。Hangzhou Babao Drainage Pump Station with large drainage is the important hydraulic engineering of Expanded Hangjiahu Nanpai.The design drainage discharge is 200 m^3/s,it is also the key project of the second channel connecting Beijing-Hangzhou Canal and Qiantang River.When the pump station is running,it influences the navigation flow condition and water-way erosion,because of the confluence of lock approach and the pump intakes.Based on the two-dimensional numerical model of the pump station and water-way near the pump,the velocity distribution near the pump intakes under different operating conditions is analyzed,and the operation scheme for the safety of water-way near the pump is proposed.
分 类 号:TV135.4[水利工程—水力学及河流动力学]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:3.144.48.13