检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:张金强 ZHANG Jinqiang(China Energy Engineering Group Guangxi Electric Power Design Institute Co.,Ltd.,Nanning,Guangxi,530007)
机构地区:[1]中国能源建设集团广西电力设计研究院有限公司,广西南宁530007
出 处:《红水河》2020年第4期15-18,共4页Hongshui River
摘 要:老挝会兰庞雅水电站引水系统因水头高、线路长、明管段覆盖层较厚,设计难度大。笔者主要介绍了引水系统布置方案的选择和主要建筑物设计,表明引水系统方案选择时应主要考虑工程投资、地质风险、施工难度和工程工期等因素;明管段设计中,镇墩裂缝控制、竖向变形协调和横向位移限制等是保证其结构安全的关键。电站2015年竣工发电后,引水系统安全运行至今,表明其设计是安全可靠的。Due to high head,long line and thick overburden in the exposed penstocks section,the design of the diversion system of Laos Houay Lamphan Gnai Hydropower Station is difficult.This paper mainly introduces the selection of diversion system layout scheme and the design of main buildings,which indicates that the project investment,geological risk,construction difficulty and construction period should be considered in the selection of diversion system scheme.In the design of exposed penstock section,the key to ensure the structural safety is the control of anchored pier cracks,deformation coordination in vertical and displacement restriction on transverse.After the power station was completed in 2015,the diversion system has been running safely,which shows that its design is safe and reliable.
分 类 号:TV732[水利工程—水利水电工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.38