检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:梁万 LIANG Wan(Chengchao Mining Company Limited of WUSTEEL Energy,Ezhou 436000,China)
机构地区:[1]武钢资源程潮矿业有限责任公司,湖北鄂州436000
出 处:《建井技术》2020年第2期19-21,28,共4页Mine Construction Technology
摘 要:程潮矿业新选矿厂雨排水隧道施工过程中,隧道出口段发生了垮冒,垮冒的松散体将隧道封堵,增加了后续施工难度。根据具体情况,经分析研究,决定垮冒段采用插杆法施工。方案实施后,顺利通过垮冒段,取得预期效果。During the construction of the rain drainage tunnel in new preparation plant of Chengchao Mining,a collapse was occurred at the exit section of the tunnel,the collapsed loosen mass blocked the tunnel and the late construction difficulty was increased.According the ascertain conditions,after the analysis and study,the construction with the rod insertion method was applied to the collapsed section of the tunnel.After the construction plan was conducted,the collapsed section was successfully passed through and the expected effect was obtained.
分 类 号:U455.49[建筑科学—桥梁与隧道工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.112