作 者:计克伟 JI Ke-wei(China Railway 17th Bureau Group Co.,Ltd.,Taiyuan 030000,China)
出 处:《价值工程》2020年第25期64-66,共3页Value Engineering
摘 要:近年来,铁路建设进入高速发展时期,但随着安全、环保、文明施工的要求的提高,铁路技术标准尤其是隧道工程的设计及施工要求也越来越高,也使现行定额略显不足。因此,对于铁路隧道工程预算定额一定要及时的进行修改,及时解决隧道预算定额在应用中存在的问题,这样对于铁路隧道工程的建设是有利的。In recent years,railway construction has entered a period of rapid development.However,with the improvement of requirements for safety,environmental protection,and civilized construction,railway technical standards,especially the design and construction requirements of tunnel engineering,have become higher and higher,which also makes the current quota slightly insufficient.Therefore,the budget quota of the railway tunnel project must be revised in time to solve the problems in the application of the tunnel budget quota in time,which is beneficial to the construction of the railway tunnel project.
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.28