检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:商波 郝鹏[3] 黄昌琴 李有元 杨志刚 SHANG Bo;HAO Peng;HUANG Changqin;LI Youyuan;YANG Zhigang(Yunnan Construction Investment First Survey and Design Co.,Ltd.,Kunming Yunnan 650102,China;Yunnan Haosheng Engineering Test and Technology Co.,Ltd.,Kunming Yunnan 650102,China;Yunnan Institute of Building Research,Kunming Yunnan 650223,China)
机构地区:[1]云南建投第一勘察设计有限公司,云南昆明650102 [2]云南昊昇工程检测技术有限公司,云南昆明650102 [3]云南省建筑科学研究院,云南昆明650223
出 处:《工程质量》2020年第8期27-30,共4页Construction Quality
摘 要:在打桩施工过程中,邻近的某教学楼出现开裂现象。为查明开裂原因,通过现场调查、补充地质勘察和现场检测,综合分析后得出了教学楼开裂的原因,并给出了一些建议,以供参考。During the piling construction,some cracks occurred in a nearby teaching.In order to find out the causes of cracking,through on-site survey,supplementary geological survey,and on-site test,the comprehensive analysis of the reasons for cracking of the teaching building was obtained,and some suggestions were given for reference.
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:18.222.164.159