打桩施工对邻近某教学楼的影响分析  

Analysis of the Impact of Piling Construction on a Nearby Teaching Building

在线阅读下载全文

作  者:商波 郝鹏[3] 黄昌琴 李有元 杨志刚 SHANG Bo;HAO Peng;HUANG Changqin;LI Youyuan;YANG Zhigang(Yunnan Construction Investment First Survey and Design Co.,Ltd.,Kunming Yunnan 650102,China;Yunnan Haosheng Engineering Test and Technology Co.,Ltd.,Kunming Yunnan 650102,China;Yunnan Institute of Building Research,Kunming Yunnan 650223,China)

机构地区:[1]云南建投第一勘察设计有限公司,云南昆明650102 [2]云南昊昇工程检测技术有限公司,云南昆明650102 [3]云南省建筑科学研究院,云南昆明650223

出  处:《工程质量》2020年第8期27-30,共4页Construction Quality

摘  要:在打桩施工过程中,邻近的某教学楼出现开裂现象。为查明开裂原因,通过现场调查、补充地质勘察和现场检测,综合分析后得出了教学楼开裂的原因,并给出了一些建议,以供参考。During the piling construction,some cracks occurred in a nearby teaching.In order to find out the causes of cracking,through on-site survey,supplementary geological survey,and on-site test,the comprehensive analysis of the reasons for cracking of the teaching building was obtained,and some suggestions were given for reference.

关 键 词:打桩 教学楼 裂缝 原因 检测 

分 类 号:TU311[建筑科学—结构工程]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象