作 者:谢志杰 罗锦雄 黄茂兴 陆金伦 XIE Zhijie;LUO Jinxiong;HUANG Maoxing;LU Jinlun(Guangdong Yuantian Engineering Co.,Ltd, Guangzhou 511340, China)
机构地区:[1]广东省源天工程有限公司,广东广州511340
出 处:《广东水利水电》2020年第8期90-93,共4页Guangdong Water Resources and Hydropower
摘 要:清远枢纽二线船闸上下游横向围堰结构在船闸主体工程完成施工后,需进行拆除、疏浚航道。该工程采用绳锯切割支架水下定位法对水下围堰结构进行拆除,拆除后的航道无残留块渣、废钢筋,无需二次重复清障,对一线船闸正常运营也无影响,方便快捷,为同类项目施工提供借鉴。The axis of the upstream longitudinal cofferdam of the second line ship lock of a hydro-project is located in the water area of the first line ship lock channel.Before the construction of this section of cofferdam,the construction platform should be filled in the water area.In this regard,the project adopts the extension method to construct the steel trestle plate platform first,and then uses the steel trestle platform to construct the large diameter steel pipe pile in the composite retaining wall structure.Through this combination of measures,the construction of the diaphragm wall can be implemented smoothly,and the adjacent first-line ship locks can continue to operate,which provides a reference for the construction of similar projects.
分 类 号:U641[交通运输工程—船舶及航道工程] TV551.3[交通运输工程—船舶与海洋工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.68