检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:杨义忠[1] 连新华[1] 张琴凤 YANG Yizhong;LIAN Xinhua;ZHANG Qinfeng(China Water Resource Pearl River Planning Surveying & Designing Co., Ltd,Guangzhou 510610,China)
机构地区:[1]中水珠江规划勘测设计有限公司,广东广州510610
出 处:《广东水利水电》2020年第8期106-108,共3页Guangdong Water Resources and Hydropower
摘 要:对隧洞开挖过程中超标准抽排水费用的计算,以抽水方量m^3计算,但部分项目无抽水方量计量资料,结合某水利工程抽水电量为计量单位计算抽水费用,执行现行的水利工程计价规定,解决了计量与计价的不配套,为同类项目抽水费用计算提供参考。For cost calculation of super standard pumping and drainage in the process of tunnel excavation,the pumping volume is calculated in cubic meters,but some projects do not have pumping volume measurement data.This paper combines the pumping power of a water conservancy project as the measurement unit to calculate the pumping cost,which not only solves the mismatch between measurement and pricing,but also combines the current pricing regulations of water conservancy projects to calculate the pumping cost of similar projects Calculation provides reference.
分 类 号:U453.6[建筑科学—桥梁与隧道工程] F407.9[交通运输工程—道路与铁道工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.15