检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:汪斌[1] 朱杰兵[1] 张振杰 张利洁[1] WANG Bin;ZHU Jie-bing;ZHANG Zhen-jie;ZHANG Li-jie(Key Laboratory of Geotechnical and Engineering of Ministry of Water Resources, Yangtze River Scientific Research Institute, Wuhan 430010, China;China Xinhua Hydropower Company Limited,Beijing 100070, China)
机构地区:[1]长江科学院水利部岩土力学与工程重点实验室,武汉430010 [2]新华水力发电有限公司,北京100070
出 处:《长江科学院院报》2020年第8期69-74,共6页Journal of Changjiang River Scientific Research Institute
基 金:国家重点研发专项(2016YFC0401801,2018YFC0407002);国家自然科学基金项目(41877280,41672320);新华水电科研课题项目(新华2016-A65);长江科学院院所基金项目(CKSF2019180/YT,CKSF2017066/YT)。
摘 要:工程岩体分级是岩石力学及其工程应用研究的最基本内容之一,当前岩体分级体系中尚无考虑高地温及高温度梯度等复杂地质环境下的围岩分级方法。依托南疆某水电站高温洞段引水隧洞工程建设,基于现场地质描绘、现场钻孔测试及室内岩石力学试验成果,采用RMR、GSI、BQ和HC等不同分级体系对高温洞段开展岩体质量评价;最后根据实际围岩级别与定性和定量分级结果对比分析,提出了高地热下围岩类别影响因子及阈值指标,给出了高地热赋存环境状态对围岩分级的修正方法,在此基础上提出适用于高地温梯度环境下的隧洞围岩质量分级与评价方法。研究表明,考虑了温度修正后,各类围岩的岩体质量评价结果相对传统方法减小1/4~1/2级,与实际定级结果更为接近,提高了分级的准确率。研究结果对于存在高地温的隧洞围岩分级有参考价值。The classification of engineering rockmass is a most basic content in rock mechanics and rock engineering application research area.However,current applied rockmass classification system doesn’t cover the rockmass classification method for surrounding rockmass under special geological conditions,such as high ground temperature and high temperature gradient.On background of a hydropower station construction in south Xinjiang,a segment of diversion tunnel with high ground temperature is chosen for surrounding rockmass classification research.On the basis of field geological mapping,in-situ acoustic test and laboratory rock mechanics test results,the RMR,GSI,BQ and HC systems are applied respectively to the rockmass classification and rockmass quality evaluation for the research segment.According to actual surrounding rockmass grade as well as qualitative and quantitative grading results,the influence factors and threshold indexes of high ground temperature are proposed.The evaluation method of surrounding rock quality method of tunnel under complex geological conditions is obtained.Results show that the rockmass quality evaluation grade results with the proposed method are reduced by 1/4~1/2 grade,much closer to the actual grading results.
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:18.220.25.158