采空区注浆充填后上方高层建筑监测方案研究  

Study on monitoring scheme of high-rise buildings above goaf after grouting filling

在线阅读下载全文

作  者:程志强 魏祥平[2] Cheng Zhiqiang;Wei Xiangping(Zhejiang Dongzhen Land Planning&Design Co.,Ltd.,Huzhou 313200,China;Huaibei Mining Group,Huaibei 235000,China)

机构地区:[1]浙江东震土地规划设计有限公司,浙江湖州313200 [2]淮北矿业集团,安徽淮北235000

出  处:《矿山测量》2020年第4期22-24,共3页Mine Surveying

摘  要:文中通过对采空区上方高层建筑运营状态下变形监测设计方案进行探讨,达到合理布设监测站、科学分析监测数据的目的,为注浆充填条件下高层建筑地基处理效果评价提供关键数据支撑作用,并为建筑物安全运营提供可靠依据。In this paper,the design scheme of the deformation monitoring for high-rise buildings was discussed mainly above goaf,the purposes of laying rationally monitoring stations and analyzing scientifically monitoring data were achieved,providing the key data support for evaluation of foundation treatment effect of high-rise buildings under grouting and filling conditions and providing the reliable basis for the safe operation of buildings.

关 键 词:采空区 注浆充填 高层建筑 变形监测 

分 类 号:TD76[矿业工程—矿井通风与安全]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象