水布垭水电站运行期地下厂房渗水分析与处理  被引量:4

Analysis and Treatment of the Water Leakage Problem in Underground Powerhouse of Shuibuya Hydropower Plant during Operation Period

在线阅读下载全文

作  者:皮军华[1] PI Junhua(Hubei Qingjiang Hydroelectric Development Co., Ltd., Yichang 443000, China)

机构地区:[1]湖北清江水电开发有限责任公司,湖北宜昌443000

出  处:《水电与新能源》2020年第8期52-57,共6页Hydropower and New Energy

摘  要:针对水布垭水电站运行期地下厂房出现的渗水情况,结合厂房结构、内外防渗设计、泄洪及强降雨检查情况等方面,对渗水原因综合、系统分析,提出相应处理措施,实施后经主汛期强降雨及泄洪检验,厂房渗水问题得到了有效解决。Excessive water leakage is observed in the underground powerhouse of Shuibuya Hydropower Plant during operation period.Considering the powerhouse structure,internal and external seepage control design,inspection situations during the flood discharge and heavy rainfalls,possible reasons of the water leakage problem are analyzed comprehensively.Treatment measures are then proposed correspondingly.Practical tests of heavy rainfalls and flood discharge in the main flood season show that the leakage problem of the powerhouse is effectively solved.

关 键 词:水布垭水电站 地下厂房 渗水处理 

分 类 号:TV731[水利工程—水利水电工程]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象