检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:皮军华[1] PI Junhua(Hubei Qingjiang Hydroelectric Development Co., Ltd., Yichang 443000, China)
机构地区:[1]湖北清江水电开发有限责任公司,湖北宜昌443000
出 处:《水电与新能源》2020年第8期52-57,共6页Hydropower and New Energy
摘 要:针对水布垭水电站运行期地下厂房出现的渗水情况,结合厂房结构、内外防渗设计、泄洪及强降雨检查情况等方面,对渗水原因综合、系统分析,提出相应处理措施,实施后经主汛期强降雨及泄洪检验,厂房渗水问题得到了有效解决。Excessive water leakage is observed in the underground powerhouse of Shuibuya Hydropower Plant during operation period.Considering the powerhouse structure,internal and external seepage control design,inspection situations during the flood discharge and heavy rainfalls,possible reasons of the water leakage problem are analyzed comprehensively.Treatment measures are then proposed correspondingly.Practical tests of heavy rainfalls and flood discharge in the main flood season show that the leakage problem of the powerhouse is effectively solved.
分 类 号:TV731[水利工程—水利水电工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:18.223.125.111