检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:王卿 蔡慧野 朱宇珂 Wang Qing;Cai Huiye;Zhu Yuke(Hangzhou Water Group Co.,Ltd.,Hangzhou 310009,China)
出 处:《给水排水》2020年第8期19-23,共5页Water & Wastewater Engineering
摘 要:随着千岛湖配供水工程九溪线通水运行,杭州市区形成了多水源联合供水的格局.杭州市水务集团有限公司在原水系统运行安全性、水质稳定性、调度经济性、水源切换灵活性等方面进行了研究,并制定了九溪线稳定运行方案及突发紧急情况应急调度方案.实际运行情况表明,九溪线原水系统可实现安全稳定运行,出厂水量可满足城市供水需求,出厂水及管网水质均符合国家标准.With the operation of Jiuxi line of Thousand-Island Lake water distribution and supply project,Hangzhou city has formed a pattern of mult-i source combined water supply.Hangzhou Water Group Co.,Ltd.has studied the operation safety,water quality stability,dispatching economy and water source switching flexibility of the raw water system,and formulated the stable operation scheme and emergency dispatching scheme of Jiuxi line.The actual operation shows that the raw water system of Jiuxi line can achieve safe and stable operation,the water can meet the demand of urban water supply,and the water quality of the waterworks and pipe network meet the national standards.
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:3.137.222.228