检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:林跃福 Lin Yuefu(Jinggong Steel(Shanghai)Co.,Ltd.,201199,China)
出 处:《特种结构》2020年第4期116-122,共7页Special Structures
摘 要:卢赛尔体育场为超大跨度双轴对称马鞍形空间张拉索膜结构,具有结构体量大、设计要求严格、安装精度要求高等特点。本文介绍了体育场主体钢结构的结构体系、构件形式及规格、球铰支座设计特点、临时支撑架的布置和主要的施工顺序。通过施工过程分析,计算得到了V柱预变形数值以及施工过程中结构的变形和受力情况,为现场施工提供了技术指导和理论支持,同时可为今后其他类似工程提供参考。Lusail stadium is a super-long-span and biaxially-symmetric saddle-shaped space tension cablemembrane structure.It is a heavy and large structure with strict design requirements and high accuracy of installation requirements.In this paper its main steel structure was introduced including structure system,component forms and specifications,spherical bearing,layout of temporary towers and main construction sequence.By construction process analysis,pre-deformation value of V frame and the deformation and stress of main steel structure were obtained,which provided technical guidance and theoretical support for on-site construction.And it can provide references for other similar projects in the future.
关 键 词:张拉索膜结构 主体钢结构 球铰支座 施工过程分析 V柱预变形
分 类 号:TU758.11[建筑科学—建筑技术科学]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.7