检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:赵惠德[1] ZHAO Hui-de(Shanxi Institute of Geological Survey,Taiyuan 030000,China)
机构地区:[1]山西省地质调查院,太原030000
出 处:《工程建设与设计》2020年第16期61-62,共2页Construction & Design for Engineering
摘 要:较为详细地阐述了地质测绘工程施工方案设计编写的流程及要点,结合当前的测绘设备以及使用的各种测绘规范、预算标准,就如何编写进行了分析说明,对在编制过程中可能遇到的问题提出解疑,对以后的地质测绘工程施工方案设计的编写具有一定的参考意义。The process and key points of the design and compilation of the construction plan of geological surveying and mapping engineering are described in detail,and how to compile the plan is analyzed in combination with the current surveying and mapping equipment and various surveying and mapping specifications and budget standards,and the possible problems encountered in the compilation process are solved.It has certain reference significance to the compilation of the construction scheme design of geological surveying and mapping engineering in the future.
分 类 号:P258[天文地球—测绘科学与技术]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.15