检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:时德禹[1] Shi Deyu(Shenyang Academy of Environmental Sciences,Shenyang Liaoning 110167,China)
出 处:《环境与发展》2020年第8期248-248,250,共2页Environment & Development
摘 要:为更好地完善我国建设项目环境管理制度体系,对我国建设项目涉及的“事前、事中、事后”环境管理制度进行梳理研究,得到结论如下:应在有关法规制定过程中,将建设项目环境管理各项制度衔接流程进行确定,明确环境影响评价制度、竣工环境保护验收制度、排污许可制度、项目环境影响后评价制度之间的区别与联系;相关制度的管理名录应统一编码规范,然后进行合理有效的融合和衔接,形成建设项目的全生命周期环境管理体系。In order to better improve the environmental management system of construction projects in China,the“fore,before,and after”environmental management systems involved in China’s construction projects are sorted out and the conclusions are as follows:In the process of formulating relevant laws and regulations,the construction The connection process of the various systems of project environmental management is determined,and the differences and connections between the environmental impact assessment system,the completed environmental protection acceptance system,the pollution discharge permit system,and the project environmental impact assessment system are clarified;the management directory of relevant systems should be uniformly coded.Then,a reasonable and effective integration and connection will be made to form a full life cycle environmental management system for construction projects.
关 键 词:环境影响评价 竣工环境保护验收 排污许可 后评价 环境管理体系
分 类 号:X820.3[环境科学与工程—环境工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.42