检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:李准[1] 徐涛[1] 颜欢 LI Zhun;XU Tao;YAN Huan(China Railway Eryuan Engineering Group Co.,Ltd.,Chengdu 610031,China)
机构地区:[1]中铁二院工程集团有限责任公司,成都610031
出 处:《高速铁路技术》2020年第4期79-83,共5页High Speed Railway Technology
摘 要:在铁路建设过程中,合理确定软土地基处理措施及其投资定额是铁路设计与施工者需要考虑的重要问题。本文以新建玉溪至磨憨铁路普洱车站强夯碎石墩处理软土地基施工为样本,在研究确定其施工参数、工艺流程及技术要求等问题的基础上,按照写实统计法和现场测定法,统计工料机消耗,分析测定强夯碎石墩定额,为弥补现行定额缺失和完善同类工程的概预算编制体系奠定基础。During the process of railway construction, it is an important issue for railway designers and constructors to reasonably determine soft soil foundation treatment measures and investment quota. In this paper, taking the construction of dynamic compaction gravel pier in Pu’er Station of Yuxi-Mohan Railway as a sample, on the basis of studying and determining the construction parameters, technological process, and technical requirements, statistics and field measurement are carried out to calculate the consumption of materials and machines, and analyze and determine the quota of dynamic compaction gravel pier, to make up the omissions in current quota and lay a foundation for perfecting the budget preparation system of similar projects.
分 类 号:U415.1[交通运输工程—道路与铁道工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.40