检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:王志杰[1] 李振[1] 徐海岩[1] 皮圣 蒋新政 WANG Zhijie;LI Zhen;XU Haiyan;PI Sheng;JIANG Xinzheng(Key Laboratory of Transportation Tunnel Engineering,Ministry of Education,Southwest Jiaotong University,Chengdu 610031,Sichuan,China;Hodge Railway Co.,Ltd.,Beijing 100000,China)
机构地区:[1]西南交通大学交通隧道工程教育部重点实验室,四川成都610031 [2]浩吉铁路股份有限公司,北京100000
出 处:《隧道建设(中英文)》2020年第8期1123-1132,共10页Tunnel Construction
基 金:国家自然科学基金项目(51678498);教育部创新团队发展计划资助项目(IRT0955);中央高校基本科研业务专项资金资助项目(SWJTU11ZT33)。
摘 要:为解决采用三台阶法施工的土砂分界地层隧道围岩变形控制难题,以浩吉铁路阳城隧道为依托,采用室内试验、数值模拟和理论分析等方法对不同隧道埋深及土砂分界位置(土砂比,即土层厚度与砂层厚度之比)下的隧道围岩变形规律进行研究,并提出围岩变形控制工法的选取原则。研究结果表明:1)不同隧道埋深及土砂比情况下的围岩变形曲线可分为变形预发展阶段、变形快速发展阶段、变形缓慢发展阶段和变形稳定阶段4个阶段,且均可采用Boltzmann函数进行良好拟合;2)当土砂比由0∶1增至1∶0时,隧道拱顶沉降、边墙水平收敛和仰拱隆起对土砂分界面的位置变化具有不同的响应规律;3)提出适用于采用三台阶法施工的土砂分界地层隧道围岩变形控制工法选取原则,并通过计算证明,该原则可有效指导围岩变形的控制。The deformation of surrounding rock of tunnel in upper soil and lower sand strata constructed by three-bench method is difficult to control.As a result,the surrounding rock deformation laws of Yangcheng Tunnel on HaolebaojiJi′an Railway under different burial depths and different ratios between upper soil and lower sand are analyzed by laboratory test,numerical simulation and theoretical analysis method;and the selection principles for surrounding rock deformation control method is put forward.The study results show that:(1)The deformation curves of surrounding rock of tunnel with different burial depths and different ratios between upper soil and lower sand can be divided into 4 stages,i.e.pre-development,rapid development,slow development and stability;and the curves can be well fitted by Boltzmann function.(2)When the ratio between upper soil and lower sand increases from 0∶1 to 1∶0,the response laws of tunnel crown settlement,horizontal convergence and inverted arch uplift vary.(3)The selection principles for the surrounding rock deformation control methods of the tunnel in upper soil and lower sand strata constructed by three-bench method are put forward,which are proved to be effective for surrounding rock deformation control.
关 键 词:隧道工程 土砂分界地层 围岩变形 控制工法 数值模拟
分 类 号:U45[建筑科学—桥梁与隧道工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.28