检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:杨冬建 卓普周 郭正刚[1] 孟智超 白亮 霍军周[1] YANG Dongjian;ZHUO Puzhou;GUO Zhenggang;MENG Zhichao;BAI Liang;HUO Junzhou(School of Mechanical Engineering,Dalian University of Technology,Dalian 116024,Liaoning,China;China Railway Engineering Equipment Group Co.,Ltd.,Zhengzhou 450000,Henan,China;China Railway Tunnel Stock Co.,Ltd.,Zhengzhou 450000,Henan,China)
机构地区:[1]大连理工大学机械工程学院,辽宁大连116024 [2]中铁工程装备集团有限公司,河南郑州450000 [3]中铁隧道股份有限公司,河南郑州450000
出 处:《隧道建设(中英文)》2020年第8期1236-1242,共7页Tunnel Construction
基 金:国家重点研发计划(2018YFC0808205,2018YFB1306701);国家自然科学基金(51875076);辽宁省自然基金(2019-KF-04-05)。
摘 要:为实现TBM换刀机器人对刀具系统的快速拆卸,提出一种基于机器操作的TBM一体化刀具系统。针对其应用场景及对象,提出6项性能评价指标,并进行分析。最后按照1∶4的缩尺比例对传统刀具系统及一体式刀具系统进行振动紧固性试验。试验结果显示:经过20 h加速度为3g、振动频率为30 Hz的振动试验后,传统刀具残余预紧力百分比下降幅度是一体化刀具系统的2.31倍,一体式刀具系统的防松性能优于传统刀具系统,所提出的新型一体式刀具系统能够满足TBM换刀机器人的要求。In order to realize rapid disassembly of TBM cutter system by robot,a TBM integrated cutter system based on robot operation is proposed.According to the applicable scenarios and objects of the integrated cutter system,six performance evaluation indices are proposed and analyzed.According to the scale of 1∶4,the vibration tightening experiment is carried out on traditional cutter system and integrated cutter system.The experimental results show that the percentage of residual preload of traditional cutter decreases 2.31 times as much as that of integrated cutter system after 20 h vibration experiment with acceleration of 3 g and vibration frequency of 30 Hz,which indicates that the anti-loose performance of integrated cutter system is better than that of the traditional one,and the new integrated cutter system recommended can meet the TBM requirement of cutter replacement by robot.
分 类 号:U455.3[建筑科学—桥梁与隧道工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.49