作  者:徐正 霍玉龙 XU Zheng;HUO Yulong(Hebei Electric Power Design&Research Institute CO.,Ltd.of China Power Construction Group,Shijiazhuang,Hebei 050031,China;Hebei Electric Power Design Engineering Research Center,Shijiazhuang,Hebei 050031,China)

机构地区:[1]中国电建集团河北省电力勘测设计研究院有限公司,河北石家庄050031 [2]河北省电力勘测设计工程技术研究中心,河北石家庄050031

出  处:《山西电力》2020年第4期62-67,共6页Shanxi Electric Power

摘  要:为了提高电厂循环水系统运行的安全可靠性,降低建设运营成本,通过对某空冷机组尖峰冷却系统的循环水系统的介绍,指出了凝汽器高位布置的循环水系统在设计运行过程中应重点关注的事项,论述了电厂循环水系统循环水泵流量复核的方法,分析了胶球冲洗系统收球率低的原因及解决措施,以供同行设计参考。In order to improve the safety and reliability of circulating water system operation in power plants and reduce construction and operation costs,based on the introduction of the circulating water system of the peak cooling system of certain air cooling unit,the matters that should be particularly concerned about in design and operation process of circulating water system of condensers with high position arrangement are put forward,and the pump flow double-check method of circulating water system in power plants is expounded.The causes of low ball-collecting rate of the rubber ball washing system and the countermeasures are also analyzed,so as to offer reference for peer design.

关 键 词:循环水系统 循环水泵 凝汽器高位布置 循环水量 汽蚀 胶球冲洗 

分 类 号:TM621[电气工程—电力系统及自动化]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象