检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:邓凯 陈泓 刁志文 马学荣 DENG Kai;CHEN Hong;DIAO Zhiwen;Ma Xuerong(Wuzhong Power Supply Company of State Grid Ningxia Electric Power Co.,Ltd.,Wuzhong Ningxia 751100,China;State Grid Ningxia Power Co.,Ltd.,Yinchuan Ningxia 750001,China)
机构地区:[1]国网宁夏电力有限公司吴忠供电公司,宁夏吴忠751100 [2]国网宁夏电力有限公司,宁夏银川750001
出 处:《宁夏电力》2020年第3期53-56,共4页Ningxia Electric Power
摘 要:针对330 kV黄侯输电线路95号3A1-ZMC1型直线杆塔倾斜的现状,进行了地质、地貌取样及卫星云图对比,分析了A、B腿侧沉降严重的原因及塔身加装拉线保护、脚板加垫板、可调式联合大板基础等处理方法,结合线路运行现状,提出了塔身安装四方拉线、A腿塔脚板下方支垫楔形垫板的纠偏措施,解决了杆塔基础因土质原因造成的基础下沉倾斜隐患。实施后运行效果良好,并推广应用至同机理倾斜杆塔上,提高了设备的健康运行水平,为类似架空输电线路杆塔倾斜处理提供参考。Based on the investigation of the tilt status of NO. 95 3 A1-ZMC1 linear tower of the330 kV Huanghou transmission line,the geological and geomorphological sampling and satellite cloud chart analysis are carried out. The causes of the serious settlement of A & B legs are analyzed. The treatment schemes such as installing stay wire protection on the tower body,adding foot plate with base plate,adjustable combined large plate foundation and new displacement transformation are analyzed.Combined with the operation status of the line,the installation of the tower body is put forward. The measures for rectifying the deviation of the wedge-shaped base plate and A-leg tower,and the final treatment plan for the new displacement and transformation,solved the hidden danger of the sinking and inclination of the tower foundation caused by the soil quality,achieved good results after implementation,and was popularized and applied to the inclined tower of the same mechanism,improved the healthy operation level of the equipment,and provided a reference for the treatment of the inclination of the tower of the overhead transmission line.
分 类 号:TM754[电气工程—电力系统及自动化]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.42